Your shipment comprises one or more pallets.
-
Remove the plastic covering from each pallet to check which items you received.
-
Unpack the equipment shipped for rack mounting the CERES DBox and connecting it to the power supply.
-
Take inventory of the equipment, parts and cables immediately after you open the box. Check for damage or missing equipment, if anything is damaged or missing, contact your VAST Data service engineer or partner.
Caution
Do not use equipment or cabling that is visibly damaged. Doing so can void your warranty.
One CERES DBox:
|
![]() |
One CERES DBox rail mount kit. For rail kit content, see Rack Mount the CERES DBox. |
|
One Bezel |
![]() |
Two C14-C19 or C20-C19 power cables |
![]() C14-C19 Power Cable ![]() C20-C19 Power Cable |
Optional: CMU/CMA for cable management |
Comments
0 comments
Article is closed for comments.